Home
  1. Backstop–in brick.

    IMG_1200

    Things are happening so fast at Jeffy’s Field that it’s hard to keep up with the pictures! This is the backstop which has now been dressed in the distinctive Shenandoah brick. Dugouts are covered, but awaiting the hunter-green standing seam metal roofs. Banded concrete in foreground will provide polished look to┬áthe top of the dugout […] Read More

  2. Another brick in the wall.

    20150402_180227

    This is a three-foot high brick back to the dugouts. The rest of the back wall will be chain link so parents can see their little ballplayers. The dugouts will have green roofing. The same brick wall will continue around and make up the backstop wall. New photos coming! Come back and see!

  3. Put me in coach…

    20150402_180006

    Looking from center field toward the dugouts and backstop wall. Irrigation is in, brickwork has begun on the dugouts, and it’s really beginning to look like a field!

  4. Solid steps forward

    image2

    Inbetween what seems to be rain showers every day, the concrete for Jeffy’s dugout and bleacher areas was delivered and poured. Now that the weather is warming, there’s something new happening almost every day at Jeffy’s Field. Irrigation is in. Brickwork, fencing and building a beautiful field is in the near future!!

  5. Ready for concrete.

    IMG_2976 (2)

    Dugout frames have been set, benches are in, and concrete floors coming soon. Wood framework at base of the dugout frame indicates where our three-foot brick wall will be built around dugouts and back of the backstop. Things are happening quickly now!