Home

Monthly Archives: March, 2015

  1. Solid steps forward

    image2

    Inbetween what seems to be rain showers every day, the concrete for Jeffy’s dugout and bleacher areas was delivered and poured. Now that the weather is warming, there’s something new happening almost every day at Jeffy’s Field. Irrigation is in. Brickwork, fencing and building a beautiful field is in the near future!!

  2. Ready for concrete.

    IMG_2976 (2)

    Dugout frames have been set, benches are in, and concrete floors coming soon. Wood framework at base of the dugout frame indicates where our three-foot brick wall will be built around dugouts and back of the backstop. Things are happening quickly now!